Xuzhou Metro Line 3 Extension’s Opening Said to be Imminent 

Latest News

spot_img

6.56 kilometres long, Xuzhou Metro Line 3 is the first in China to be extended at both ends simultaneously. With expectations at a high, the Line’s 93 day test period saw a total of 683,700 kilometres worth of journeys operated safely by trains. Full story (in Chinese) via this link; read lots more of the latest news from Xuzhou via this link.

徐州地铁3号线长6.56公里,是中国第一条两端同时延伸的线路。 由于期望值很高,这条线路的93天测试期共有683,700公里的旅程由火车安全运营。 完整故事(中文)通过此链接;通过此链接阅读更多来自徐州的最新消息。

Visiting Nanjing