Procedures for the approach bridges and connection lines on both sides of the new Shengpu Bridge in Wuzhong District were not obtained in advance, leading media to call for planning and construction that is serious, coordinated and forward-looking. Full story (in Chinese) via this link; read lots more of the latest news from Suzhou via this link.
吴中区新胜浦桥两侧的通道桥和连接线的程序没有提前获得,导致媒体呼吁认真、协调和前瞻性地规划和建设。 完整故事(中文)通过此链接;通过此链接阅读更多来自苏州的最新消息。




