With the capability for crew to directly transfer to and from wind turbines, the “Zhizhen 100” has completed 3 days of tests off the Nantong coast. Being taller than other ships, its wind farm maintenance operational window is widened. Full story (in Chinese) via this link; read the absolute essentials about Nantong via this link.
Asia’s 1st Offshore Wind Power Operation & Maintenance Mother Ship Debuts
![The Nanjinger - Asia’s 1st Offshore Wind Power Operation & Maintenance Mother Ship Debuts The Nanjinger - Asia’s 1st Offshore Wind Power Operation & Maintenance Mother Ship Debuts](https://i0.wp.com/www.thenanjinger.com/wp-content/uploads/2024/04/The-Nanjinger-Asias-1st-Offshore-Wind-Power-Operation-Maintenance-Mother-Ship-Debuts.jpg?resize=696%2C417&ssl=1)