The girder for the super-large bridge across the North Jiangsu Irrigation Canal and the Huaihe River, weighing nearly 110 tonnes, was installed on 22 July. Full story (in Chinese) via this link.
![The Nanjinger - Huai’an Section of Provincial Highway 264 Sees Final Box Girder Installed The Nanjinger - Huai’an Section of Provincial Highway 264 Sees Final Box Girder Installed](https://i0.wp.com/www.thenanjinger.com/wp-content/uploads/2023/07/The-Nanjinger-Huaian-Section-of-Provincial-Highway-264-Sees-Final-Box-Girder-Installed.jpg?resize=696%2C417&ssl=1)
The girder for the super-large bridge across the North Jiangsu Irrigation Canal and the Huaihe River, weighing nearly 110 tonnes, was installed on 22 July. Full story (in Chinese) via this link.