Wuxi Leads the Way in Development of Hydrogen Internal Combustion Engine

Latest News

spot_img

5 July saw the inauguration for the 1,000 sqm Phase 1 hydrogen power test base of Tonghui New Energy Vehicle Innovation Research Institute in Wuxi Huishan Economic and Technological Development Zone. Phase 2 is to be 30,000 sqm. Full story (in Chinese) via this link; read lots more of the latest news from Wuxi via this link.

7月5日,无锡惠山经济技术开发区同辉新能源汽车创新研究院1000平方米第一期氢能试验基地落成典礼。 第2阶段是30,000平方米。 完整故事(中文)通过此链接;通过此链接阅读更多来自无锡的最新消息。

Visiting Nanjing