The last concrete has been poured for the starting shaft of the14.25-km long and 15.4-metre wide Chongtai Tunnel; trains shall speed through it at 350 km/h. Full story (in Chinese) via this link; read the absolute essentials about Suzhou via this link.
长14.25公里、宽15.4米的崇泰隧道的起点井已经浇筑了最后一个混凝土;火车应以350公里/小时的速度通过。 完整故事(中文)通过此链接;通过此链接阅读关于苏州的绝对要点。



