A 4-day assessment meeting which concluded 27 August agreed that Line 8 has met the requirements for fully automatic operation at GoA4 level, meaning initial operation is a go. Line 8 is 35.6KM long, with 28 stations and 12 interchanges. Full story (in Chinese) via this link; read lots more of the latest news from Suzhou via this link.
8月27日结束的为期4天的评估会议同意,8号线已经满足了GoA4级别的全自动操作要求,这意味着初始操作是启动的。 8号线长35.6公里,有28个车站和12个交汇处。 完整故事(中文)通过此链接;通过此链接阅读更多来自苏州的最新消息。



