Xuzhou Opens 8.13 Kilometre Extension to Metro Line 3

Latest News

spot_img

Opened on 3 December, phase 2 of Xuzhou Metro Line 3 comprises a northern extension comprising five stations and a short southern extension, just 1.57 kilometres long with one station. Trains operate at an average interval of 9 minutes. Full story (in Chinese) via this link; read lots more of the latest news from Xuzhou via this link.

徐州地铁3号线第2期于12月3日开通,包括一个由五个车站组成的北部延伸线和一个短的南部延伸线,长仅1.57公里,有一个车站。 火车的平均运行间隔为9分钟。 完整故事(中文)通过此链接;通过此链接阅读更多来自徐州的最新消息。

Visiting Nanjing