Entire Shanghai-Suzhou-Huzhou High Speed Line Complete; Static Tests to Begin

Latest News

spot_img

On 30 July, the final section of contact wire was hoisted to the last of 7,237 pillars which had been assembled in 525 days, over a total length of 591 kilometres. The Line is also known as a Lake Tai Jiangnan Water Town Tourist line. Full story (in Chinese) via this link; read lots more of the latest news from Suzhou via this link.

7月30日,接触线的最后一部分被吊到7237根柱子中的最后一根,这些柱子在525天内组装好,总长度为591公里。 这条线路也被称为台湖江南水镇旅游线路。 完整故事(中文)通过此链接;通过此链接阅读更多来自苏州的最新消息。

Visiting Nanjing