The two piles, featuring both wired and wireless charging, have been installed in Suzhou New District. There were 308,400 NEVs in Suzhou in June, 2023, #1 in Jiangsu. Full story via this link.
The two piles, featuring both wired and wireless charging, have been installed in Suzhou New District. There were 308,400 NEVs in Suzhou in June, 2023, #1 in Jiangsu. Full story via this link.