The cutter suction dredgers, “Tianji” and “Tianyu” are working 24/7 to meet deadlines for the Jiangsu Huadian Ganyu LNG receiving station project, which features three 220,000 cubic metre storage tanks plus unloading terminal. Full story (in Chinese) via this link; read the absolute essentials about Lianyungang via this link.
No CNY Break for Dredgers Hard at Work in Lianyungang on LNG Facility
![The Nanjinger - No CNY Break for Dredgers Hard at Work in Lianyungang on LNG Facility The Nanjinger - No CNY Break for Dredgers Hard at Work in Lianyungang on LNG Facility](https://i0.wp.com/www.thenanjinger.com/wp-content/uploads/2024/02/The-Nanjinger-No-CNY-Break-for-Dredgers-Hard-at-Work-in-Lianyungang-on-LNG-Facility.jpg?resize=696%2C417&ssl=1)