Conventional construction was ruled out given the densely intertwined section of the water network in Xinghua City, the helicopter was brought in on 24 September to assist with the erection of the 220 kV tower over Changrong Town. Full story (in Chinese) via this link; read lots more of the latest news from Taizhou via this link.