spot_img

Suzhou Rail Transit Line 8 to Open 10:00 on 10 September; Ride Free for 3 Days!

Latest News

spot_img

Those transferring to Line 8 from lines 1-6 and Line 11 shall first need to exit the station and then use the designated channel as per on-site signage. 5 years in the making and with 28 stations, Line 8 is 35.6 kilometres long. Full story (in Chinese) via this link; read lots more of the latest news from Suzhou via this link.

Visiting Nanjing

The Nanjinger